On Sept. 17, 2008, the deputy general manager Zhou Shouwei, assistant general manager Liujian and their entourage of CNOOC came to inspect and exchange with Wison. Huang Xin, general manager of Wison (Nantong) heavy industry warmly welcomed the guests, the two sides held friendly and in-depth exchange.
In early 2006, COSL, together with GOIMAR Mexico, through international public bidding, obtained the contract of 4 sets of module drilling rigs construction project which was supplied by PEMEX. Wison implemented the manufacturing of 4 sets modules rigs, which created the history of co-operation with COSL and CNOOC. Besides the short delivery term, Wison hadn't the experience and performance of manufacturing the module drilling rig previously. Under Wison's well-organized, with the great efforts of the project team, 4 sets of modules drilling rigs had been delivered on time in accordance with all international standards. The success of the project won the high praise from Mr Fu Chengyu, general manager of CNOOC.